First Choice Building Products Frame Prepration for Removable Mullion Template
Open the original PDF document
View PDFFRAME PREPARATION FOR REMOVABLE MULLION
1. Locate the top and bottom mounting brackets butted up to the inside face of the door and at the center of the door opening so that both doors will equally overlap the mullion. (Use the mounting brackets as templates to locate mounting holes.)
1/4" (FROM FINISHED FLOOR)
- 3. Attach the two Mullion Portion of Security Clips using the pre-drilled holes.
- 4. Slide Mullion Cover Plate over the top of the mullion with the mounting holes closest to the top.