980 Mullion Installation Instructions

Open the original PDF document

View PDF

Installation Instructions

980 Series

Mullions

  • 1. Install bottom retainer. Secure bottom retainer to the surface of the finished floor.
  • 2. Install top retainer. Secure top retainer to the surface of top stop. Use (4) #14 x 1" flat head wood screws or (4) 1/4"-20 x 5/8" flat head machine screws.
  • 3. Swing mullion into place. Place mullion in bottom retainer. Cut off top of the mullion, if needed to fit correctly. Secure the mullion in place by tightening the set screws in the bottom retainer, and by screwing the top retainer clamp in place.

This product can expose you to lead which is known to the state of California to cause cancer and birth defects or other reproductive harm. For more information go to www.P65warnings.ca.gov.