88322_R2-MRS_Instruction

Open the original PDF document

View PDF

MRS pdqSMART INSTALLATION INSTRUCTION

MORTISE LOCK

ALL MRS – EXCLUDING STS Phone: 866-874-3662 | www.pdqlocks.com

1. CHECK HANDING OF LOCK BODY

If handing of lock body is not correct for opening, consult factory for handing instruction.

2. INSTALL CHASSIS, TRIM, TURNPIECE & CYLINDER

  • Prepare door according to included template.
  • Install mortise chassis while feeding chassis wire into hole on inside of door.
  • Gently pull wire through hole as chassis is inserted.
  • Install trim using included instruction.

3. INSTALL READER AND INSIDE MOUNTING PLATE

  • Install reader assembly and inside mounting plate – feed reader wire through hole in door and through slot under circuit board.
  • Feed chassis wire through T slot in mounting plate.
  • Secure with (3) M5 x 50 pan head screws (thru bolts).
  • Make both wire connections after reader is secure. Push extra wire into door cavity.

MRS pdqSMART INSTALLATION INSTRUCTION

MORTISE LOCK

ALL MRS – EXCLUDING STS

4. INSTALL BATTERY PACK

  • Plug in battery wire to control board.
  • Install battery pack over two studs on mounting plate.
  • Snap battery pack onto retainers on mounting plate.

5. INSTALL BATTERIES AND BATTERY COVER

Install batteries and battery cover with (2) #8-32 x 1" pan head screws.